Midnight

 

M & A Engineering Ltd line bore the ‘A’ Frame Bracket and Stern Tube bearing bores, on the aluminium hulled yacht ‘Midnight’, under repair at the Pendennis Shipyard, Falmouth, England.

 

M & A Engineering Ltd was requested, by the Pendennis Shipyard, to machine the bearing location bores on the ‘A’ Frame and Stern Tube.

 Line boring task prior to machining

 

View of the ‘A’ Frame & Stern Tube Bores Prior To Machining

 

The yard discovered there was a misalignment between the gearbox, stern tube bearing, and ‘A’ frame bearing locations. The Pendennis Engineers provided M & A with datum references to re-bore the two bearing locations and correct the misalignment.

 

Both line-boring bars in-situ

 

Boring Equipment Set In The Two Bearing Location Bores

 

 

By utilising two sets of equipment, the ‘A’ frame bore, and Stern Tube bore, could be machined simultaneously.

 

'A' frame and Stern Tube bore machining in progress

 

Machining In Progress

 

Stern Tube machining set-up

                                                            

Note The Tight Clearance Between The Hull and Boring Equipment

 

 

 

 

Please call +44 (0)1646 698192 or email us with your requirements.

Or go to Contact Us page