
Hull Bridge Machining
We have successfully completed the extensive on-site machining of the tracks on the Hull North Bridge.The in-situ machining of (2 off) 8 metre flat tracks and (2 off) 8 metre curved tracks on Hull's North Bridge were completed, as shown in the photo's on the left.
On-site machining took place with the bridge in the upright position.
Works completed July 2005
View the Hull bridge (cantilever) machining video
|
![]() |
|
If you have a bespoke requirement, call 01646 698192 to discuss your requirement, or email us with the details.
Copyright © M & A Engineering Ltd. - Website developed by dotnet works - website map
http://www.mandaengineering.co.uk - http://www.on-sitemachining.co.uk - http://www.inlineboring.co.uk
http://www.mandaengineering.co.uk - http://www.on-sitemachining.co.uk - http://www.inlineboring.co.uk
