|
|
|
Grande FranciaM & A Engineering have undertaken the rudder bore machining repair on the Grande Francia, at A&P’s yard in Falmouth, England.
Optical alignment targets set up in datum bore
Boring bar being aligned with the datum bore
Optical alignment through the boring bar. Each section of the modular boring bar is fitted with an optical target; thus ensuring true alignment to the datum and eliminating any catenary between the boring bar supporting bearings.
Machining of the Ø510mm bore
Controlling the machining operation
Stepped sleeve fitted by A&P prior to machining the front face square to the taper bore
Machining the front of the inserted taper bush and front face flush
A&P engineers check the taper fit
Please call +44 (0)1646 698192 or email us with your requirements. Or go to Contact Us page
|
|
|









